mejorar ereccion

After firing the boiler during operation at maximum output 2

After firing the boiler, during operation at maximum output (2 to 4 loads), we heat the accumulation tanks to the requested temperature of 90 - 100°c then we let the boiler burn out after that, we take heat from the reservoir via a three-way valve, for a time period corresponding to the size of the reservoir and outside temperature in the heating period (provided that the minimum accumulator capacities are observed), this can amount to 1 to 3 days in.

Added: 2018-06-29 | Comments: 0 | Category: boiler service